Redenergy Service / Example Half-year revision
 

Biomass CHP Neufahrn

  Systems data

  Fuel technology:                              air-cooled pusher grate
Heat input:                                         21MW
Fuel:                                                    biomass, waste wood
S.H. Steam generated:                   23,3 t/h
S.H. Steam temperature:               430°C
S.H. Steam pressure:                     55 bar

  
  Work carried out

+ Production of inspection schedules
+ Coordination of various external companies required for the
   inspection
+ Manufacture and supply of various expendable parts
+ Routine checks on the whole system, for example:

  Service_9.jpg
       > Visual check on fuel feed
     > Grate check
     > Check on lining
     > Inspection of biomass boiler on flue gas side
     > Check on ash discharge

  + Maintenance work on grate and grate drive
+ Wall strength measurements on the superheater and
   eco-bundles
+ Boiler cleaning
+ Maintenance work on the lining incl. seam maintenance
+ Replacement of worn out eco-arches
+ Replacement of worn out superheater pipes
+ Fittings service
+ Production of a boiler status report incl. wall strength records
   and recommended further measures

Contact >>

Bertsch Holding GmbH
Herrengasse 23
6700 Bludenz
Austria

T: + 43.5552.6135-0
F: + 43.5552.663 59
E: service@bertsch.at

Hotline: + 43.5552.6135-400
 
© BERTSCH Holding Austria GmbH
All Rights Reserved